Utility Cross Connection Mitigation at Two Refineries - 7 YEAR PROJECT
Marine Terminal Air Compressor Upgrade, including Electrical, Piping, Civil/Structural, Instrumentation
New Medium Voltage 350HP Air Compressor Package Including Permitting, Electrical, Piping, Civil/Structural and Instrumentation
OTHER REFINERY PROJECTS - DETAILED ENGINEERING/DESIGN BY ADVANTIV ENGINEERING
Refinery Unit Fire Damage Repairs, Provided Pipe Stress Analysis and Piping Engineering/Design
Sulfur Plant Truck Rack Major Structural Modifications
Jet Filter Replacement - New Vessel, Piping and Instrumentation
Laboratory Renovation – Structural and Electrical Upgrades
PETROLEUM TERMINAL PROJECTS IN CALIFORNIA
Inland Terminal LAX Fuels - Phase 1 - 1,100 FT of 10" pipe and pipe support design to pump jet fuel to Los Angeles Airport (Completed engineering plus 70 drawings in 2-months).
Inland Terminal LAX Fuels - Phase 2 - 1,000 FT of 10" pipe and pipe support design to pump jet fuel to Los Angeles Airport (Completed engineering plus 70 drawings in 2-months).
Carson Terminal Pump Curves Project - Mechanical
Storm Pond New VFD and Pump Control Modifications – Electrical & Control Systems
Contact Water Outfall CO2 LEL Upgrade – Mechanical & Control Systems