2021 - 2022 PM & DETAILED ENGINEERING/DESIGN BY ADVANTIV ENGINEERING
- Replace TK-6685 West Bleach Injection System
- LARC, Emergency Notification Audio Paging System
- PM, Crude Unit Primary Primary Column RV Mitigation
- PM, NSPS Continuous Emissions Monitoring System Output to Data Acquisition Handling System
- PM, Crude Unit Cooling Tower Fan Upgrades
- PM, HDT, Install Pulsation Dampeners on P-4B Wash Water
- PM, LARC, SRU, Replace Waste Heat Boiler E-5171 (SCOT 2)
- PM, HDT, Install ABS Analyzer for V-6 Sour Water
- CK-1 Waste Heat Boiler New Relief Valve
- Marine Terminal Lube Oil Truck Rack Gangway
- Utility Cross Connection Mitigation at Two Refineries - 7 YEAR PROJECT
- Marine Terminal Air Compressor Upgrade, including Electrical, Piping, Civil/Structural, Instrumentation
- New Medium Voltage 350HP Air Compressor Package Including Permitting, Electrical, Piping, Civil/Structural and Instrumentation
OTHER REFINERY PROJECTS - DETAILED ENGINEERING/DESIGN BY ADVANTIV ENGINEERING
- Refinery Unit Fire Damage Repairs, Provided Pipe Stress Analysis and Piping Engineering/Design
- Sulfur Plant Truck Rack Major Structural Modifications
- Jet Filter Replacement - New Vessel, Piping and Instrumentation
- Laboratory Renovation – Structural and Electrical Upgrades
PETROLEUM TERMINAL PROJECTS IN CALIFORNIA
- 2022 Project - Inland Terminal LAX Fuels - Phase 1 - 1,100 FT of 10" pipe and pipe support design to pump jet fuel to Los Angeles Airport (Completed engineering plus 70 drawings in 2-months).
- 2022 Project - Inland Terminal LAX Fuels - Phase 2 - 1,000 FT of 10" pipe and pipe support design to pump jet fuel to Los Angeles Airport (Completed engineering plus 70 drawings in 2-months).
- Carson Terminal Pump Curves Project - Mechanical
- Storm Pond New VFD and Pump Control Modifications – Electrical & Control Systems
- Carson Jet Tanks Thermal Relief Valve Code Compliance upgrades - Mechanical
- Contact Water Outfall CO2 LEL Upgrade – Mechanical & Control Systems