Home
About Us
Client Advantages
Engineering Services
Projects
  • MAJOR TERMINAL UPGRADE
  • 350 HP AIR COMPRESSOR
  • Process Water Well
  • Increase TAN Limits
  • API Vapor Control
  • Bio-Diesel
  • Sulfur Pit Sweep Air
  • SRU Vapor Seal
  • PUBLIC ADDRESS SYSTEM
  • Other Relevant Projects
Contracting Opportunities
Contact Us
Home
About Us
Client Advantages
Engineering Services
Projects
  • MAJOR TERMINAL UPGRADE
  • 350 HP AIR COMPRESSOR
  • Process Water Well
  • Increase TAN Limits
  • API Vapor Control
  • Bio-Diesel
  • Sulfur Pit Sweep Air
  • SRU Vapor Seal
  • PUBLIC ADDRESS SYSTEM
  • Other Relevant Projects
Contracting Opportunities
Contact Us
More
  • Home
  • About Us
  • Client Advantages
  • Engineering Services
  • Projects
    • MAJOR TERMINAL UPGRADE
    • 350 HP AIR COMPRESSOR
    • Process Water Well
    • Increase TAN Limits
    • API Vapor Control
    • Bio-Diesel
    • Sulfur Pit Sweep Air
    • SRU Vapor Seal
    • PUBLIC ADDRESS SYSTEM
    • Other Relevant Projects
  • Contracting Opportunities
  • Contact Us

  • Home
  • About Us
  • Client Advantages
  • Engineering Services
  • Projects
    • MAJOR TERMINAL UPGRADE
    • 350 HP AIR COMPRESSOR
    • Process Water Well
    • Increase TAN Limits
    • API Vapor Control
    • Bio-Diesel
    • Sulfur Pit Sweep Air
    • SRU Vapor Seal
    • PUBLIC ADDRESS SYSTEM
    • Other Relevant Projects
  • Contracting Opportunities
  • Contact Us

Other Relevant projects

PM & DETAILED ENGINEERING/DESIGN BY ADVANTIV ENGINEERING

  • Replace TK-6685 West Bleach Injection System
  • LARC, Emergency Notification Audio Paging System
  • PM, Crude Unit Primary Primary Column RV Mitigation
  • PM, NSPS Continuous Emissions Monitoring System Output to Data Acquisition Handling System
  • PM, Crude Unit Cooling Tower Fan Upgrades
  • PM, HDT, Install Pulsation Dampeners on P-4B Wash Water
  • PM, LARC, SRU, Replace Waste Heat Boiler E-5171 (SCOT 2)
  • PM, HDT, Install ABS Analyzer for V-6 Sour Water
  • CK-1 Waste Heat Boiler New Relief Valve
  • Marine Terminal Lube Oil Truck Rack Gangway 
  • Utility Cross Connection Mitigation at Two Refineries - 7 YEAR PROJECT
  • Marine Terminal Air Compressor Upgrade, including Electrical, Piping, Civil/Structural, Instrumentation 
  • New Medium Voltage 350HP Air Compressor Package Including Permitting,  Electrical, Piping, Civil/Structural and Instrumentation

OTHER REFINERY PROJECTS - DETAILED ENGINEERING/DESIGN BY ADVANTIV ENGINEERING

  • Refinery Unit Fire Damage Repairs, Provided Pipe Stress Analysis and Piping Engineering/Design  
  • Sulfur Plant Truck Rack Major Structural Modifications
  • Jet Filter Replacement - New Vessel, Piping and Instrumentation
  • Laboratory Renovation – Structural and Electrical Upgrades

PETROLEUM TERMINAL PROJECTS IN CALIFORNIA

  • Inland Terminal LAX Fuels - Phase 1 - 1,100 FT of 10" pipe and pipe support design to pump jet fuel to Los Angeles Airport (Completed engineering plus 70 drawings in 2-months).
  • Inland Terminal LAX Fuels - Phase 2 - 1,000 FT of 10" pipe and pipe support design to pump jet fuel to Los Angeles Airport (Completed engineering plus 70 drawings in 2-months).
  • Carson Terminal Pump Curves Project - Mechanical
  • Storm Pond New VFD and Pump Control Modifications – Electrical & Control Systems
  • Carson Jet Tanks Thermal Relief Valve Code Compliance upgrades - Mechanical
  • Contact Water Outfall CO2 LEL Upgrade – Mechanical & Control Systems

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept